Mostrar el registro sencillo del ítem

dc.creatorSalas-Navarro K.
dc.creatorAcevedo Chedid, Jaime
dc.creatorÁrquez G.M.
dc.creatorFlorez W.F.
dc.creatorOspina-Mateus H.
dc.creatorSana S.S.
dc.creatorCárdenas-Barrón L.E.
dc.date.accessioned2020-03-26T16:33:11Z
dc.date.available2020-03-26T16:33:11Z
dc.date.issued2019
dc.identifier.citationJournal of Advances in Management Research
dc.identifier.issn09727981
dc.identifier.urihttps://hdl.handle.net/20.500.12585/9193
dc.description.abstractPurpose: The purpose of this paper is to propose an economic production quantity (EPQ) inventory model considering imperfect items and probabilistic demand for a two-echelon supply chain. The production process is imperfect and the imperfect quality items are removed from the lot size. The demand rate of the inventory system is random and follows an exponential probability density function and the demand of the retailers is depending on the initiatives of the sales team. Design/methodology/approach: Two approaches are examined. In the non-collaborative approach, any member of the supply chain can be the leader and takes decisions to optimize the profits, and in the collaborative system, all members make joint decisions about the production, supply, sales and inventory to optimize the profits of the supply chain members. The calculus approach is applied to find the maximum profit related to the members of the supply chain. Findings: A numerical example is presented to illustrate the performance of the EPQ model. The results show that collaborative approach generates greater profits to the supply chain and the market’s demand represents the variable behavior and uncertainty that is generated in the replenishment of a supply chain. Originality/value: The new and major contributions of this research are: the inventory model considers demand for products is random variable which follows an exponential probability distribution function and it also depends on the initiatives of sales teams, the imperfect production system generates defective items, different cycle time are considered in manufacturer and retailers and collaborative and non-collaborative approaches are also studied. © 2019, Emerald Publishing Limited.eng
dc.format.mediumRecurso electrónico
dc.format.mimetypeapplication/pdf
dc.language.isoeng
dc.publisherEmerald Group Publishing Ltd.
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/
dc.sourcehttps://www.scopus.com/inward/record.uri?eid=2-s2.0-85075526753&doi=10.1108%2fJAMR-07-2019-0141&partnerID=40&md5=fe14ffe1c6a8144f52e7ec5f5106f4c5
dc.titleAn EPQ inventory model considering an imperfect production system with probabilistic demand and collaborative approach
dcterms.bibliographicCitationCárdenas-Barrón, L.E., Sana, S.S., A production-inventory model for a two-echelon supply chain when demand is dependent on sales teams’ initiatives (2014) International Journal of Production Economics, 155, pp. 249-258
dcterms.bibliographicCitationChakraborty, T., Giri, B.C., Chaudhuri, K.S., Production lot sizing with process deterioration and machine breakdown (2008) European Journal of Operational Research, 185 (2), pp. 606-618
dcterms.bibliographicCitationChung, K.J., Hou, K.L., An optimal production run time with imperfect production processes and allowable shortages (2003) Computers & Operations Research, 30 (4), pp. 483-490
dcterms.bibliographicCitationGross, D., Harris, C.M., On one-for-one-ordering inventory policies with state-dependent leadtimes (1971) Operations Research, 19 (3), pp. 735-760
dcterms.bibliographicCitationHarris, F.W., How many parts to make at once (1913) Factory, the Magazine of Management, 10 (2), pp. 135-136. , 152
dcterms.bibliographicCitationHejazi, S.R., Tsou, J.C., Rasti, B.M., Optimal lot size of EPQ model considering imperfect and defective products (2008) Journal of Industrial Engineering International, 4 (7), pp. 59-68
dcterms.bibliographicCitationKim, C.H., Hong, Y., An optimal production run length in deteriorating production processes (1999) International Journal of Production Economics, 58 (2), pp. 183-189
dcterms.bibliographicCitationKundu, A., Guchhait, P., Panigrahi, G., Maiti, M., An imperfect EPQ model for deteriorating items with promotional effort dependent demand (2017) Journal of Intelligent & Fuzzy Systems, 33 (1), pp. 649-666
dcterms.bibliographicCitationLee, S.D., Lan, S.C., Yang, C.M., Economic production lot sizing model with stochastic demand (2014) Asia-Pacific Journal of Operational Research, 31 (3), pp. 1-23
dcterms.bibliographicCitationLi, N., Chan, F.T., Chung, S.H., Tai, A.H., An EPQ model for deteriorating production system and items with rework (2015) Mathematical Problems in Engineering, 2015, pp. 1-10
dcterms.bibliographicCitationMateen, A., Chatterjee, A.K., Mitra, S., VMI for single-vendor multi-retailer supply chains under stochastic demand (2015) Computers & Industrial Engineering, 79, pp. 95-102
dcterms.bibliographicCitationNavarro, K.S., Chedid, J.A., Florez, W.F., Mateus, H.O., Cárdenas-Barrón, L.E., Sana, S.S., A collaborative EPQ inventory model for a three-echelon supply chain with multiple products considering the effect of marketing effort on demand (2019) Journal of Industrial & Management Optimization, pp. 272-283
dcterms.bibliographicCitationPal, B., Sana, S., Chaudhuri, K., A mathematical model on EPQ for stochastic demand in an imperfect production system (2013) Journal of Manufacturing Systems, 32 (1), pp. 260-270
dcterms.bibliographicCitationPal, S., Mahapatra, G.S., A manufacturing-oriented supply chain model for imperfect quality with inspection errors, stochastic demand under rework and shortages (2017) Computers & Industrial Engineering, 106, pp. 299-314
dcterms.bibliographicCitationRosenblatt, M.J., Lee, H.L., Economic production cycles with imperfect production processes (1986) IIE transactions, 18 (1), pp. 48-55
dcterms.bibliographicCitationSajadieh, M.S., Larsen, C., A coordinated manufacturer-retailer model under stochastic demand and production rate (2015) International Journal of Production Economics, 168, pp. 64-70
dcterms.bibliographicCitationSalas-Navarro, K., Maiguel-Mejía, H., Acevedo-Chedid, J., Inventory management methodology to determine the levels of integration and collaboration in supply chain (2017) Ingeniare, 25 (2), pp. 326-337
dcterms.bibliographicCitationSalas Navarro, K., Chedid, J.A., Caruso, N.M., Sana, S.S., An inventory model of three-layer supply chain of wood and furniture industry in the Caribbean region of Colombia (2018) International Journal of Systems Science: Operations & Logistics, 5 (1), pp. 69-86
dcterms.bibliographicCitationSana, S.S., Chedid, J.A., Navarro, K.S., A three layer supply chain model with multiple suppliers, manufacturers and retailers for multiple items (2014) Applied Mathematics and Computation, 229, pp. 139-150
dcterms.bibliographicCitationSarkar, B., Moon, I., An EPQ model with inflation in an imperfect production system (2011) Applied Mathematics and Computation, 217 (13), pp. 6159-6167
dcterms.bibliographicCitationSarkar, M., Sarkar, B., An economic manufacturing quantity model with probabilistic deterioration in a production system (2013) Economic Modelling, 31, pp. 245-252
dcterms.bibliographicCitationTaft, E.W., The most economical production lot (1918) Iron Age, 101 (18), pp. 1410-1412
dcterms.bibliographicCitationTai, A.H., Economic production quantity models for deteriorating/imperfect products and service with rework (2013) Computers & Industrial Engineering, 66 (4), pp. 879-888
dcterms.bibliographicCitationWee, H.M., Widyadana, G.A., A production model for deteriorating items with stochastic preventive maintenance time and rework process with FIFO rule (2013) Omega, 41 (6), pp. 941-954
dcterms.bibliographicCitationWidyadana, G.A., Wee, H.M., An economic production quantity model for deteriorating items with multiple production setups and rework (2012) International Journal of Production Economics, 138 (1), pp. 62-67
dcterms.bibliographicCitationZhou, Y.-W., A production-inventory model for a finite time-horizon with linear trend in demand and shortages (1995) Systems Engineering-Theory and Practice, 5, pp. 43-49
dcterms.bibliographicCitationZhou, Y.W., Chen, J., Wu, Y., Zhou, W., EPQ models for items with imperfect quality and one-time-only discount (2015) Applied Mathematical Modelling, 39 (3-4), pp. 1000-1018
datacite.rightshttp://purl.org/coar/access_right/c_16ec
oaire.resourceTypehttp://purl.org/coar/resource_type/c_6501
oaire.versionhttp://purl.org/coar/version/c_970fb48d4fbd8a85
dc.type.driverinfo:eu-repo/semantics/article
dc.type.hasversioninfo:eu-repo/semantics/acceptedVersion
dc.identifier.doi10.1108/JAMR-07-2019-0141
dc.subject.keywordsEPQ model
dc.subject.keywordsInventory
dc.subject.keywordsOptimization
dc.subject.keywordsProbabilistic demand
dc.subject.keywordsSupply chain
dc.rights.accessrightsinfo:eu-repo/semantics/restrictedAccess
dc.rights.ccAtribución-NoComercial 4.0 Internacional
dc.identifier.instnameUniversidad Tecnológica de Bolívar
dc.identifier.reponameRepositorio UTB
dc.type.spaArtículo
dc.identifier.orcid57193504630
dc.identifier.orcid57193533853
dc.identifier.orcid57211959662
dc.identifier.orcid6602152047
dc.identifier.orcid57194034904
dc.identifier.orcid15078194000
dc.identifier.orcid6506675064


Ficheros en el ítem

FicherosTamañoFormatoVer

No hay ficheros asociados a este ítem.

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

http://creativecommons.org/licenses/by-nc-nd/4.0/
http://creativecommons.org/licenses/by-nc-nd/4.0/

Universidad Tecnológica de Bolívar - 2017 Institución de Educación Superior sujeta a inspección y vigilancia por el Ministerio de Educación Nacional. Resolución No 961 del 26 de octubre de 1970 a través de la cual la Gobernación de Bolívar otorga la Personería Jurídica a la Universidad Tecnológica de Bolívar.