Mostrar el registro sencillo del ítem

dc.contributor.editorFigueroa-Garcia J.C.
dc.contributor.editorDuarte-Gonzalez M.
dc.contributor.editorJaramillo-Isaza S.
dc.contributor.editorOrjuela-Canon A.D.
dc.contributor.editorDiaz-Gutierrez Y.
dc.creatorMontoya O.D.
dc.creatorHincapié R.A.
dc.creatorGranada M.
dc.date.accessioned2020-03-26T16:33:07Z
dc.date.available2020-03-26T16:33:07Z
dc.date.issued2019
dc.identifier.citationCommunications in Computer and Information Science; Vol. 1052, pp. 537-551
dc.identifier.isbn9783030310189
dc.identifier.issn18650929
dc.identifier.urihttps://hdl.handle.net/20.500.12585/9172
dc.description.abstractThis article presents a methodology that allows to obtain an optimal plan of re-configuration of the local distribution system to 13.2 kV, considering the improvement in the continuity of the service to the users and the reduction of technical losses in the network. The methodology consists of two phases: The first deals with the problem of the reconfiguration of primary distribution circuits through permanent measures and temporary measures. The second phase ad-dresses one of the main problems in the planning of the expansion of distribution networks, which consists of the location of the distribution substations, which represent the main link between transmission and distribution systems. The implementation of the methodology allows to simulate different scenarios and constitutes a tool for the planning of the distribution system of the regional operators (OR) of the local distribution systems (LDS). © 2019, Springer Nature Switzerland AG.eng
dc.description.sponsorshipUniversidad Tecnológica de Pereira, UTP
dc.format.mediumRecurso electrónico
dc.format.mimetypeapplication/pdf
dc.language.isoeng
dc.publisherSpringer
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/
dc.sourcehttps://www.scopus.com/inward/record.uri?eid=2-s2.0-85075689605&doi=10.1007%2f978-3-030-31019-6_45&partnerID=40&md5=7d97c9fbca141d16fe52f81c6d843611
dc.titleIntegrated Methodology for the Planning of Electrical Distribution System Considering the Continuity of the Service and the Reduction of Technical Losses
dcterms.bibliographicCitationBaran, M.E., Wu, F.F., Network reconfiguration in distribution systems for loss reduction and load balancing (1989) IEEE Trans. Power Del., 4 (2), pp. 1401-1407
dcterms.bibliographicCitationBillinton, R., Jonnavithula, S., Optimal switching device placement in radial distribution systems (1996) IEEE Trans. Power Del., 11 (3), pp. 1646-1651
dcterms.bibliographicCitationDarabi, F., Shooshtari, A.T., Babaei, E., Darabi, S., Reliability cost allocation of protective devices using binary programming (2011) 2011 IEEE Symposium on Business, Engineering and Industrial Applications, pp. 469-474. , pp., September
dcterms.bibliographicCitationPopovic, D.S., Glamocic, L.R., Nimrihter, M.D., The optimal automation level of medium voltage distribution networks (2011) Int. J. Electr. Power Energy Syst., 33 (3), pp. 430-438
dcterms.bibliographicCitation(2006) Utp-Colciencias: Reducción De pérdidas Por Etapas En Sistemas De distribución, , Technical report, Universidad Tecnológica de Pereira
dcterms.bibliographicCitation(2010) Medidas Para La reducción De pérdidas técnicas En Los Sistemas De distribución, , Technical report, Universidad Tecnológica de Pereira
dcterms.bibliographicCitationFerreira, G., Bretas, A., A nonlinear binary programming model for electric distribution systems reliability optimization (2012) Int. J. Electr. Power Energy Syst., 43 (1), pp. 384-392
dcterms.bibliographicCitationThompson, G.L., Wall, D.L., A branch and bound model for choosing optimal substation locations (1981) IEEE Trans. Power App. Syst. PAS, 100 (5), pp. 2683-2688
dcterms.bibliographicCitationTemraz, H., Salama, M., A planning model for siting, sizing and timing of distribution substations and defining the associated service area (2002) Electr. Power Syst. Res., 62 (2), pp. 145-151
dcterms.bibliographicCitationMasud, E., An interactive procedure for sizing and timing distribution substations using optimization techniques (1974) IEEE Trans. Power App. Syst. PAS, 93 (5), pp. 1281-1286
dcterms.bibliographicCitationCrawford, D.M., Holt, S.B., A mathematical optimization technique for locating and sizing distribution substations, and deriving their optimal service areas (1975) IEEE Trans. Power App. Syst., 94 (2), pp. 230-235
dcterms.bibliographicCitationSun, D.I., Farris, D.R., Cote, P.J., Shoults, R.R., Chen, M.S., Optimal distribution substation and primary feeder planning via the fixed charge network formulation (1982) IEEE Trans. Power App. Syst. PAS, 101 (3), pp. 602-609
dcterms.bibliographicCitationGanguly, S., Das, N.C.S.D., Recent advances on power distribution system planning: A state-of-the-art survey (2013) Energy Syst, 4 (2), pp. 165-193
dcterms.bibliographicCitationDeb, K., Pratap, A., Agarwal, S., Meyarivan, T., A fast and elitist multiobjective genetic algorithm: NSGA-II (2002) IEEE Trans. Evol. Comput., 6 (2), pp. 182-197
dcterms.bibliographicCitationChu, P., Beasley, J., A genetic algorithm for the multidimensional knapsack problem (1998) J. Heuristics, 4 (1), pp. 63-86
datacite.rightshttp://purl.org/coar/access_right/c_16ec
oaire.resourceTypehttp://purl.org/coar/resource_type/c_c94f
oaire.versionhttp://purl.org/coar/version/c_970fb48d4fbd8a85
dc.source.event6th Workshop on Engineering Applications, WEA 2019
dc.type.driverinfo:eu-repo/semantics/conferenceObject
dc.type.hasversioninfo:eu-repo/semantics/publishedVersion
dc.identifier.doi10.1007/978-3-030-31019-6_45
dc.subject.keywordsElectric distribution system
dc.subject.keywordsOptimal expansion planning
dc.subject.keywordsReconfiguration
dc.subject.keywordsSubstations
dc.subject.keywordsGeographical distribution
dc.subject.keywordsDistribution substations
dc.subject.keywordsElectric distribution systems
dc.subject.keywordsElectrical distribution system
dc.subject.keywordsExpansion planning
dc.subject.keywordsIntegrated methodology
dc.subject.keywordsLocal distribution system
dc.subject.keywordsReconfiguration
dc.subject.keywordsTransmission and distribution systems
dc.subject.keywordsElectric substations
dc.rights.accessrightsinfo:eu-repo/semantics/restrictedAccess
dc.rights.ccAtribución-NoComercial 4.0 Internacional
dc.identifier.instnameUniversidad Tecnológica de Bolívar
dc.identifier.reponameRepositorio UTB
dc.description.notesThis work was supported by the MSc Program in Electrical Engineering of Universidad Tecnologica de Pereira. The authors also thank the Research Group ?Desarrollo en Investigacion de Operaciones-DINOP?.
dc.relation.conferencedate16 October 2019 through 18 October 2019
dc.type.spaConferencia
dc.identifier.orcid56919564100
dc.identifier.orcid55490505900
dc.identifier.orcid57205147684


Ficheros en el ítem

FicherosTamañoFormatoVer

No hay ficheros asociados a este ítem.

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

http://creativecommons.org/licenses/by-nc-nd/4.0/
http://creativecommons.org/licenses/by-nc-nd/4.0/

Universidad Tecnológica de Bolívar - 2017 Institución de Educación Superior sujeta a inspección y vigilancia por el Ministerio de Educación Nacional. Resolución No 961 del 26 de octubre de 1970 a través de la cual la Gobernación de Bolívar otorga la Personería Jurídica a la Universidad Tecnológica de Bolívar.