Mostrar el registro sencillo del ítem

dc.creatorVidal-Carreras P.I.
dc.creatorGarcia-Sabater J.P.
dc.creatorCoronado Hernández, Jairo Rafael
dc.date.accessioned2020-03-26T16:32:57Z
dc.date.available2020-03-26T16:32:57Z
dc.date.issued2012
dc.identifier.citationEuropean Journal of Operational Research; Vol. 219, Núm. 2; pp. 396-404
dc.identifier.issn03772217
dc.identifier.urihttps://hdl.handle.net/20.500.12585/9100
dc.description.abstractThis paper presents an algorithm to define the optimal parameters for deliberated and controlled coproduction in an economic lot scheduling problem setting (DCCELSP). Coproduction is said to be deliberated and controlled because it is possible to decide whether or not to coproduce when all the parameters associated with the process are known. The aim is to determine how to produce two products most economically where deliberated coproduction is an option. For this purpose, a procedure for defining optimal lot periods is introduced. Two models are proposed for this procedure and a numerical illustration is provided to gain insight into their dynamics. The cost advantages of coproduction were found to depend on the relationship between setup and holding costs, production rates, and demand for products. The more similar these system parameters are and the higher the machine usage ratio is, the more favourable coproduction is. Additionally, if coproduction is not deliberated appropriately, costs soar. © 2011 Elsevier B.V. All rights reserved.eng
dc.description.sponsorshipUniversidad Politécnica de Cartagena Ministerio de Ciencia e Innovación, MICINN
dc.format.mediumRecurso electrónico
dc.format.mimetypeapplication/pdf
dc.language.isoeng
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/
dc.sourcehttps://www.scopus.com/inward/record.uri?eid=2-s2.0-84857052143&doi=10.1016%2fj.ejor.2011.12.020&partnerID=40&md5=9b904d361d4b7e5f5bbbb89eeccfdbc1
dc.titleEconomic lot scheduling with deliberated and controlled coproduction
dcterms.bibliographicCitationAgrah, S., A dynamic uncapacitated lot-sizing problem with co-production (2011) Optimization Letters, pp. 1-11
dcterms.bibliographicCitationAkturk M.Selim, Onen, S., Dynamic lot sizing and tool management in automated manufacturing systems (2002) Computers and Operations Research, 29 (8), pp. 1059-1079. , DOI 10.1016/S0305-0548(00)00103-9, PII S0305054800001039
dcterms.bibliographicCitationBitran, G.B., Leong, T.Y., Coproduction of substitutable products (1995) Production Planning & Control, 6 (1), pp. 13-25
dcterms.bibliographicCitationBitran, G.R., Dasu, S., Ordering policies in an environment of stochastic yields and substitutable demands (1992) Operations Research, 40 (5), pp. 999-1017
dcterms.bibliographicCitationBitran, G.R., Gilbert, S.M., Coproduction processes with random yields in the semiconductor industry (1994) Operations Research, 42 (3), pp. 476-491
dcterms.bibliographicCitationBitran, G.R., Leong, T.Y., Deterministic approximations to coproduction problems with service constraints and random yields (1992) Management Science, 38 (5), pp. 724-742
dcterms.bibliographicCitationBomberger, E.E., A dynamic programming approach to a lot size scheduling problem (1966) Management Science, 12 (11), p. 778
dcterms.bibliographicCitationBravo, D., Rodriguez, E., Medina, M., Nisin and lacticin 481 coproduction by Lactococcus lactis strains isolated from raw ewes' milk (2009) Journal of Dairy Science, 92 (10), pp. 4805-4811
dcterms.bibliographicCitationChiu, S.W., Cheng, C.B., Wu, M.F., Yang, J.C., An algebraic approach for determining the optimal lot size for epq model with rework process (2010) Mathematical & Computational Applications, 15 (3), pp. 364-370
dcterms.bibliographicCitationDelporte, C.M., Thomas, L.J., Lot sizing and sequencing for N-products on one facility (1977) Management Science, 23 (10), pp. 1070-1079
dcterms.bibliographicCitationDeuermeyer, B.L., Multi-type production system for perishable inventories (1979) Operations Research, 27 (5), pp. 935-943
dcterms.bibliographicCitationDeuermeyer, B.L., Pierskalla, W.P., By-product production system with an alternative (1978) Management Science, 24 (13), pp. 1373-1383
dcterms.bibliographicCitationDobson Gregory, Economic lot-scheduling problem: Achieving feasibility using time-varying lot sizes (1987) Operations Research, 35 (5), pp. 764-771
dcterms.bibliographicCitationDoll, C.L., Whybark, D.C., An iterative procedure for the single-machine multi-product lot scheduling problem (1973) Management Science, 20 (1), pp. 50-55
dcterms.bibliographicCitationElmaghraby, S.E., The economic lot scheduling problem (ELSP): Review and extensions (1978) Management Science, 24 (6), pp. 587-598
dcterms.bibliographicCitationGerchak, Y., Tripathy, A., Wang, K., Co-production models with random functionality yields (1996) IIE Transactions (Institute of Industrial Engineers), 28 (5), pp. 391-403
dcterms.bibliographicCitationHanssmann, F., (1962) Operations-Research in Production and Inventory Control, , J. Wiley New York
dcterms.bibliographicCitationHsu, W.L., On the general feasibility test of scheduling lot sizes for several products on one machine (1983) Management Science, 29 (1), pp. 93-105
dcterms.bibliographicCitationKarimi, B., Fatemi Ghomi, S.M.T., Wilson, J.M., The capacitated lot sizing problem: A review of models and algorithms (2003) Omega, 31 (5), pp. 365-378. , DOI 10.1016/S0305-0483(03)00059-8, PII S0305048303000598
dcterms.bibliographicCitationLisbona, P., Romeo, L.M., Enhanced coal gasification heated by unmixed combustion integrated with an hybrid system of SOFC/GT (2008) International Journal of Hydrogen Energy, 33 (20), pp. 5755-5764
dcterms.bibliographicCitationLopez, M.A.N., Kingsman, B.G., The economic lot scheduling problem - Theory and practice (1991) International Journal of Production Economics, 23 (13), pp. 147-164
dcterms.bibliographicCitationMadigan, J.G., Scheduling a multi-product single machine system for an infinite planning period (1968) Management Science, 14 (11), pp. 713-719
dcterms.bibliographicCitationNahmias, S., Moinzadeh, K., Lot sizing with randomly graded yields (1997) Operations Research, 45 (6), pp. 974-986
dcterms.bibliographicCitationNielsen, D.R., Yoon, S.H., Yuan, C.J., Prather, K.L.J., Metabolic engineering of acetoin and meso-2,3-butanediol biosynthesis in E. coli (2010) Biotechnology Journal, 5 (3), pp. 274-284
dcterms.bibliographicCitationOner, S., Bilgic, T., Economic lot scheduling with uncontrolled co-production (2008) European Journal of Operational Research, 188 (3), pp. 793-810. , DOI 10.1016/j.ejor.2007.05.016, PII S0377221707004936
dcterms.bibliographicCitationOu, J.H., Wein, L.M., Dynamic scheduling of a production inventory system with by-products and random yield (1991) Management Science, 41 (6), pp. 1000-1017
dcterms.bibliographicCitationSox, C.R., Jackson, P.L., Bowman, A., Muckstadt, J.A., A review of the stochastic lot scheduling problem (1999) International Journal of Production Economics, 62 (3), pp. 181-200
dcterms.bibliographicCitationTaskin, Z.C., Unal, A.T., Tactical level planning in float glass manufacturing with co-production, random yields and substitutable products (2009) European Journal of Operational Research, 199 (1), pp. 252-261
dcterms.bibliographicCitationVemuganti, R.R., On the feasibility of scheduling lot sizes for two products on one machine (1978) Manage Sci, 24 (15), pp. 1668-1673
dcterms.bibliographicCitationVidal-Carreras, P.I., Garcia-Sabater, J.P., Comparison of heuristics for an economic lot scheduling problem with deliberated coproduction (2009) Journal of Industrial Engineering and Management, 2 (3), pp. 437-463
dcterms.bibliographicCitationVidal-Carreras, P.I., Garcia-Sabater, J.P., Marín-Garcia, J.A., Garcia-Sabater, J.J., Parts grouping in ELSP (2008) Insights on Current Organization Engineering, p. 291
dcterms.bibliographicCitationViswanathan, S., Goyal, S.K., On 'Manufacturing batch size and ordering policy for products with shelf lives' (2002) International Journal of Production Research, 40 (8), pp. 1965-1970. , DOI 10.1080/00207540210123661
dcterms.bibliographicCitationWinands, E.M.M., Adan, I.J.B.F., Van Houtum, G.J., The stochastic economic lot scheduling problem: A survey (2011) European Journal of Operational Research, 210 (1), pp. 1-9
dcterms.bibliographicCitationZhu, X., Wilhelm, W.E., Scheduling and lot sizing with sequence-dependent setup: A literature review (2006) IIE Transactions (Institute of Industrial Engineers), 38 (11), pp. 987-1007. , DOI 10.1080/07408170600559706, PII J784373L461611VQ
datacite.rightshttp://purl.org/coar/access_right/c_16ec
oaire.resourceTypehttp://purl.org/coar/resource_type/c_6501
oaire.versionhttp://purl.org/coar/version/c_970fb48d4fbd8a85
dc.type.driverinfo:eu-repo/semantics/article
dc.type.hasversioninfo:eu-repo/semantics/publishedVersion
dc.identifier.doi10.1016/j.ejor.2011.12.020
dc.subject.keywordsControlled coproduction
dc.subject.keywordsDeliberated coproduction
dc.subject.keywordsLot sizing
dc.subject.keywordsProduction
dc.subject.keywordsScheduling
dc.subject.keywordsCo-production
dc.subject.keywordsCost advantages
dc.subject.keywordsDeliberated coproduction
dc.subject.keywordsEconomic lot scheduling
dc.subject.keywordsEconomic lot scheduling problems
dc.subject.keywordsGain insight
dc.subject.keywordsHolding costs
dc.subject.keywordsLot sizing
dc.subject.keywordsOptimal parameter
dc.subject.keywordsProduction rates
dc.subject.keywordsTwo-product
dc.subject.keywordsOptimization
dc.subject.keywordsProduction
dc.subject.keywordsScheduling
dc.rights.accessrightsinfo:eu-repo/semantics/restrictedAccess
dc.rights.ccAtribución-NoComercial 4.0 Internacional
dc.identifier.instnameUniversidad Tecnológica de Bolívar
dc.identifier.reponameRepositorio UTB
dc.description.notesThe work described in this paper has been supported by the project “CORSARI MAGIC DPI2010-18243” of the Ministerio de Ciencia e Innvovación of Government of Spain within the Program “Proyectos de Investigación Fundamental no orientada”. The translation of this paper was funded by the Universidad Politécnica de Valencia, Spain. Appendix A
dc.type.spaArtículo
dc.identifier.orcid37662305100
dc.identifier.orcid16636045200
dc.identifier.orcid54383095000


Ficheros en el ítem

FicherosTamañoFormatoVer

No hay ficheros asociados a este ítem.

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

http://creativecommons.org/licenses/by-nc-nd/4.0/
http://creativecommons.org/licenses/by-nc-nd/4.0/

Universidad Tecnológica de Bolívar - 2017 Institución de Educación Superior sujeta a inspección y vigilancia por el Ministerio de Educación Nacional. Resolución No 961 del 26 de octubre de 1970 a través de la cual la Gobernación de Bolívar otorga la Personería Jurídica a la Universidad Tecnológica de Bolívar.