Mostrar el registro sencillo del ítem
Control System for Project Management in a Construction Sector Company through the Earned Value Technique in the Caribbean
dc.contributor.author | Magier, Dupperley | |
dc.contributor.author | Cardenas, Ismael | |
dc.contributor.author | Padron, Raul | |
dc.contributor.author | Gualdron, Carlos | |
dc.contributor.author | Villa, Jose | |
dc.date.accessioned | 2023-07-21T16:25:08Z | |
dc.date.available | 2023-07-21T16:25:08Z | |
dc.date.issued | 2022 | |
dc.date.submitted | 2023 | |
dc.identifier.citation | Magier, D., Cardenas, I., Padron, R., Gualdron, C., & Villa, J. (2022). Control system for project management in a construction sector company through the earned value technique in the Colombian Caribbean. Proceedings of the 20th LACCEI International Multi-Conference for Engineering, Education and Technology: “Education, Research and Leadership in Post-Pandemic Engineering: Resilient, Inclusive and Sustainable Actions.” | spa |
dc.identifier.uri | https://hdl.handle.net/20.500.12585/12344 | |
dc.description.abstract | The present research work generates a solution to some inconveniences presented in an organization that executes construction projects, which has presented problems of delays in the works, cost overruns in the activities and reduction of the scope of the projects, for this reason it is carried out an analysis of the bibliography related to project management systems based on the earned value methodology and through documentary observation. Through an information collection tool, a diagnosis of the object of study was made, and it was extended to the construction sector of the Colombian Atlantic Coast with the objective of having regional trends. With the analysis of the results obtained, a project management system was proposed based on some of the organizational strengths that the company has. The design and implementation of this system are intended to improve the success of projects in terms of cost, duration a nd scope. © 2022 Latin American and Caribbean Consortium of Engineering Institutions. All rights reserved. | spa |
dc.format.extent | 11 páginas | |
dc.format.mimetype | application/pdf | spa |
dc.language.iso | eng | spa |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | * |
dc.source | Proceedings of the LACCEI international Multi-conference for Engineering, Education and Technology | spa |
dc.title | Control System for Project Management in a Construction Sector Company through the Earned Value Technique in the Caribbean | spa |
dc.title.alternative | Sistema de Control para la Gerencia de Proyectos en una Compañía del Sector de la Construcción a través la Técnica del Valor Ganado en el Caribe | spa |
dcterms.bibliographicCitation | The future work leading the way with PMTQ (2019) Pulse of The Profesion PMI, [En línea]. Available https://www.pmi.org/media/pmi/documents/public/pdf/learning/thought-leadership/pulse/pulseof-the-profession-2019 | spa |
dcterms.bibliographicCitation | (2018) CHAOS Report. Cited 3 times. | spa |
dcterms.bibliographicCitation | leming, Q. W., Koppelman, J. M. (2010) Earned Valvue Project Management 4th Edition. Cited 407 times. Arlington: Project Management Institute | spa |
dcterms.bibliographicCitation | Batselier, J., Vanhoucke, M. Improving project forecast accuracy by integrating earned value management with exponential smoothing and reference class forecasting (2017) International Journal of Project Management, 35 (1), pp. 28-43. Cited 72 times. http://www.elsevier.com/inca/publications/store/3/0/4/3/5/index.htt doi: 10.1016/j.ijproman.2016.10.003 | spa |
dcterms.bibliographicCitation | Warburton, R. D., Ciof, D. F. Estimación de un proyecto ganado y duración final (2016) International Journal of Project Management, pp. 1493-1504. | spa |
dcterms.bibliographicCitation | Kerkhove, L.-P., Vanhoucke, M. Extensions of earned value management: Using the earned incentive metric to improve signal quality (2017) International Journal of Project Management, 35 (2), pp. 148-168. Cited 32 times. http://www.elsevier.com/inca/publications/store/3/0/4/3/5/index.htt doi: 10.1016/j.ijproman.2016.10.014 | spa |
dcterms.bibliographicCitation | Tariq, S., Ahmad, N., Usman Ashraf, M., Alghamdi, A.M., Alfakeeh, A.S. Measuring the Impact of Scope Changes on Project Plan Using EVM (2020) IEEE Access, 8, art. no. 9172051, pp. 154589-154613. Cited 6 times. http://ieeexplore.ieee.org/xpl/RecentIssue.jsp?punumber=6287639 doi: 10.1109/ACCESS.2020.3018169 | spa |
dcterms.bibliographicCitation | Netto, J.T., de Oliveira, N.L.F., Freitas, A.P.A., Dos Santos, J.A.N. CRITICAL FACTORS AND BENEFITS IN THE USE OF EARNED VALUE MANAGEMENT IN CONSTRUCTION (2020) Brazilian Journal of Operations and Production Management, 17 (1), art. no. e2020571. Cited 5 times. https://bjopm.org.br/bjopm/article/download/571/915 doi: 10.14488/BJOPM.2020.007 | spa |
dcterms.bibliographicCitation | Valentín, K. B., Bendezú, R. I. (2016) Mejora en la aplicación del EVM como sistema de control de costos de proyectos de construcción Universidad Peruanade Ciencias Aplicadas (UPC) | spa |
dcterms.bibliographicCitation | Bagherpour, M., Khaje Zadeh, M., Mahmoudi, A., Deng, X. Interpretive structural modeling in earned value management (2020) Journal of Civil Engineering and Management, 26 (6), pp. 524-533. Cited 7 times. http://journals.vgtu.lt/ doi: 10.3846/jcem.2020.12182 | spa |
dcterms.bibliographicCitation | Grosso, D. K., Monroy, L. F. (2016) Aplicación de la metodología del valor ganado en un proyecto de construcción de vivienda caso de estudio: proyecto residencial Bellomonte Universidad Industrial de Santander | spa |
dcterms.bibliographicCitation | Rivera, Z. A., Abril, M. S., Mendoza, J. O. (2017) El método del valor ganado como indicador del control y seguimiento a proyectos Universidad Francisco de PaulaSantander | spa |
dcterms.bibliographicCitation | Cardenas, I. (2017) Uso de Técnicas y Herramientas de la Gerencia de Proyectos en empresa del sector de la construcción de la Ciudad de Cartagena D.T. y C Universidad Tecnológica de Bolívar | spa |
dcterms.bibliographicCitation | Kerzner, H. R. (2013) Project Management a Systems Approach ti Planning, Scheduling, ando Controlling 11th Edition. Cited 2422 times. New York | spa |
dcterms.bibliographicCitation | (2017) Guia del PMBOK Sexta Edicion Newtown Square, Pennsynvania | spa |
dcterms.bibliographicCitation | (2005) Earned Valvue Systems-Intent Guide-ANSI/EIA-748A NDIA. Arlington | spa |
dcterms.bibliographicCitation | (2005) Earned Valvue System-Acceptance Guide-ANSI EIA-748-C NDIA. Arlington | spa |
datacite.rights | http://purl.org/coar/access_right/c_abf2 | spa |
oaire.version | http://purl.org/coar/version/c_b1a7d7d4d402bcce | spa |
dc.type.driver | info:eu-repo/semantics/article | spa |
dc.type.hasversion | info:eu-repo/semantics/draft | spa |
dc.identifier.doi | 10.18687/LACCEI2022.1.1.387 | |
dc.subject.keywords | Earned Value Management; | spa |
dc.subject.keywords | Project Control; | spa |
dc.subject.keywords | Costs And Cost Analysis | spa |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | spa |
dc.rights.cc | Attribution-NonCommercial-NoDerivatives 4.0 Internacional | * |
dc.identifier.instname | Universidad Tecnológica de Bolívar | spa |
dc.identifier.reponame | Repositorio Universidad Tecnológica de Bolívar | spa |
dc.publisher.place | Cartagena de Indias | spa |
dc.subject.armarc | LEMB | |
dc.type.spa | http://purl.org/coar/resource_type/c_6501 | spa |
oaire.resourcetype | http://purl.org/coar/resource_type/c_6501 | spa |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
Productos de investigación [1453]
Universidad Tecnológica de Bolívar - 2017 Institución de Educación Superior sujeta a inspección y vigilancia por el Ministerio de Educación Nacional. Resolución No 961 del 26 de octubre de 1970 a través de la cual la Gobernación de Bolívar otorga la Personería Jurídica a la Universidad Tecnológica de Bolívar.